Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 12, 2023     Firewall Insulation - (4 hours)       Category: Firewall
Final installation of the fiberfrax panel.
Cleaned the steel foil, used firebarrier2000 to create a fillet around the firewall perimeter and around the engine mount. Used wooden bars to keep the fiberfrax/steel foil attached to the firewall.
Prepared the Steel Eyeball passthrough for the 4 bowden cables (drilled to the right diameter for each passthrough).
Modified the steel cabin air vents installing a nut plate on each valve to simplify installation of the cable clamp.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.